Destruction of returned and expired clinical trial supplies through an approved, documented process with counting, reconciliation and certified destructio…

IMPinvestigational product
IVDkits and reagents
MDmedical devices
End-to-endoperating model

Study close-out

Close returns and destruction through reconciliation

01

Request and authority check

Define sites, products, lots/kits, quantities and transport. Client-facing output: Transfer record.

02

Stock/lot/kit reconciliation

Check package, identity, quantity and temperature evidence. Client-facing output: Reconciliation table.

03

Quarantine and segregation

Separate returns physically and in the system. Client-facing output: Contractor document.

04

Approved-contractor coordination

Compare dispatch, use, return, loss and remainder. Client-facing output: Destruction certificate.

Short answer

What does this service actually solve?

Returns and destruction reconcile unused products by lot, kit and quantity before written sponsor approval, waste segregation, authorised transfer and closure evidence.

Procurement brief

Destruction

Destruction closes unused supply through approval, reconciliation, segregation and documented contractor handling.

Included in scope

  • Request and authority check
  • Stock/lot/kit reconciliation
  • Quarantine and segregation
  • Approved-contractor coordination
  • Outcome-document tracking

Outside scope

  • Destruction without customer approval
  • Closing unreconciled stock
  • Acceptance of out-of-scope waste
01

Inputs we need

  • Approved destruction list
  • Product and waste classification
  • Lot/kit/quantity data
  • Witnessing requirements
02

Records delivered

  • Transfer record
  • Reconciliation table
  • Contractor document
  • Destruction certificate
03

Risks affecting timing

  • Return and destruction-list mismatch
  • Incorrect waste classification
  • Incomplete approval chain

RACI

Decision and record ownership

Sponsor/CROReturn instruction, reconciliation decision and written destruction approval
SiteUse records, segregation and return handover
Omega DepotReceipt, quarantine, reconciliation and contractor coordination
ContractorWaste receipt, authorised treatment and certificate

Exception scenarios

Keep control when the plan changes

Return count differs from site record

Exclude from destruction until kit/lot investigation closes.

Product identity is unreadable

Quarantine separately and await sponsor decision.

Waste is outside contractor scope

Hold securely until an authorised route is confirmed.

Operating model

From uncertainty to a traceable outcome

Every project follows the same control logic, adapted to product and protocol requirements.

  1. 01

    Return plan

    Define sites, products, lots/kits, quantities and transport.

  2. 02

    Return receipt

    Check package, identity, quantity and temperature evidence.

  3. 03

    Quarantine

    Separate returns physically and in the system.

  4. 04

    Reconciliation

    Compare dispatch, use, return, loss and remainder.

  5. 05

    Destruction approval

    Submit the final list and waste class for written approval.

  6. 06

    Contractor transfer

    Preserve authorised chain and quantity/weight evidence.

  7. 07

    Closure

    Link certificate, reconciliation and exceptions to archive.

Service-specific FAQ

What to know before scoping

Can Omega destroy without sponsor approval?

No. The final list and authority chain require written confirmation.

Can returned product re-enter stock?

Only after defined quality assessment and authorised decision.

What is on the certificate?

As applicable: contractor, date, category/method, quantity or weight and reference.

Can destruction happen at a site?

Product, waste and local requirements need separate assessment; it is not default.

How is missing stock closed?

Investigation, sponsor explanation and accepted reconciliation are recorded.

Omega Depot

Plan your next shipment with confidence

Share the product, route and timeline; our team will map a workable operational flow.